Typical Challenges

ꁲ

Load Adjustment

Test projects require different load capacities and adjustment ranges.

Test Stability

Changing load must preserve suitable test conditions.

Thermal Management

High-power water-resistor tests need water-temperature and level control.

Test-system Integration

Loads must work with measurement, control and monitoring systems.